Introduction cloth machine

Introduction cloth machine

The ability to follow the construction industry to carry out the construction of the parties now facing the machine operator's habits and have a lot of pleading, pleading for the machine are more stringent, in order to implore the new construction of the development of customary kneading formula boom. When the pump the water through the control valve gap below withdraw tanks, hydraulic pump concrete barriers from the hopper, pump, barriers, automatic brick machine china price control valves, pumps and tanks and other components. Gap in the pump body. Estrangement subsidence, concrete hopper pressure to open the check valve into the pump; pump when the water in the tank through the control valve to withdraw the pump, pressure water to raise barriers, closed one-way valve is pressed into the concrete duct discharge. Production of concrete pump rate, to a level concrete end straight slow delivery, but concrete cooperation ratio, coarse and fine aggregate particle size and size distribution, the amount of cement, concrete slump have some pleading, in order to ensure outstanding pumping performance.

Within climb jacking operation

Top of the preparatory work within the climbing rose before ⑴ the boom collapsed, flat. ⑵ lifting valve block I turned on the fast connections, turn on the pump, manually operated valve, full travel telescopic lifting cylinder piston, empty running five minutes, keeping the oil flow. ⑶ installation within the framework of the uppermost climb. ⑷ relax within eight to climb on the top corners of the block frame. ⑸ adjustment climb within eight corners on the guide wheel frame to the tower main chord gap is about 2mm, and to ensure that the rolling freely. ⑹ appropriate to lengthen the length of the external main cable entry to prevent pull off the cable within the climb. (Next climb jacking only within no more than four windy conditions) ⑺ climb inside to check whether the device reliable connection, whether the whole state is stable, progressive block concrete mixer india suppliers if the hydraulic system is working properly, the weather is normal, if everything is ready to start within climb jacking

Dust treatment improvements

For concrete mixing station fly ash, cement, slag and dust removal station improvements. 1. yard and back yard aggregate transportation and packaging. Within 2 stations dust-prone points need to install filter. 3. The back yard because semi-closed state, when the installation of dust in the mouth and feed yard field unit installation spray equipment. To create a water curtain dust purposes. The station can be installed high pressure sprinklers, regularly clean the dust inside the station may also play green vegetation watering purposes.

Sewage Improvement

The main sewage cleaning sewage into mixers and blenders and natural CONSERVANCY concrete mixer manufacturers rain. Available for collection by the direct supply of rational production and use of sewage treatment and clean use of vehicles and the main station. Sewage water recycling, to achieve zero discharge of wastewater production target entire station. Waste Improvement Waste is divided into surplus within stirred tank waste and waste water treatment sedimentation. These wastes may be subjected to pressure filtration and classification, as an added material in different sizes with reasonable grade of concrete production. Will not have an impact on the quality of concrete, also realized the whole point of the solid waste disposal problem. Noise control improvements Noise is the production of noise and vehicle noise. Production of noise can be designed for the entire station, using concrete enclosed structure, the largest noise control words will be closed in the workshop production, such as compressed air compressor can be purpose-built enclosed room. Part of the increase in vibration damping pads, reduce noise sources. It may be natural gas vehicles and increase the station walls, reduce vehicle noise output for vehicle noise.