Steel bending machine usage

Steel bending machine usage 1, was tested on the interception of a long metal wire 200-250mm period, straightening, straightening must not damage the wire surface. 2, according to the parameter list to select the clip wire diameter circle radius r, the lever clip to the underside of the top of the arc distance b, and lever hole Φ, clips on each pay a radius of curvature of digital prints concrete vibrator china brand to choose from the distance b is adjusted by the lever arm on the location of the three holes obtained, the following sequence 35,50,75 up lever hole Φ according to numbers around the hole lever print identification. 3, there are four holes perpendicular to each other on the main lever, align the lever in the direction you need to obtain holes, when using the threaded end of the hole should be put on the sleeve, use the other end of the hole should be Remove the sleeve to ensure that the wire is bent the center line. 4, the rocker arm in a vertical position, and thus as the starting state test, the sample first hole penetrated two tablets sandwiched floor, then vertically upward from the lower lever through the lever hole rethread the clip to the top, turn the handle on the cartridge to clamp the upper end of the wire. 5, hand to clamp down on the press after 15-25mm stabilize (coarse wire distance should have 15-25 kg of the wire tensioning force) Turn the handle to the lower end of the main clip clamping bending. 6, when bending specimens should be used more uniform speed (about 1 times / sec).  7, bend count is bent 90 ° to the right from the starting position, then return to the starting position the sample for the first time, then left bend 90 °, the sample and then the anti-back to the starting position for a second, so to break up the sample, the sample broken last bend insensitive. 8, circular surface after prolonged use clip appear concrete needle vibrator for sale price if traces of crushing the clip should be replaced. 9, oil cups and relative sliding shall constantly refuel and maintain lubrication. 10, should wipe with a clean and coated with anti-rust oil to prevent corrosion. 11. Installation: The machine should be installed at the edge of the table, and turn the handle extends in the table, the mounting screws for the three M8 screws on the bottom plate of the two clips into a hole Φ10, the table should also be drilled a hole in the wire through the hole in freedom.

Our best supplier of high-quality concrete construction equipment - such as concrete mixing plant, concrete mixer truck, concrete pumps and related equipment and spare parts. With a wide range, good quality, reasonable prices and stylish designs, we have broad domestic and international markets. On the domestic market, covering almost all provinces in China. In overseas markets, we have also construction machinery honda vibrator concrete vibrator hose with CE been exported to over 45 countries and regions, annual sales reached 10 billion yuan. In Singapore, Pakistan, Thailand, the United Arab Emirates, Libya, we can offer in the field of concrete equipment-stop 'service. Professional skills and improve sales service to meet your every need.

Welcome to the new and old customers to visit our in Zhengzhou City, Henan Province, China's capital plant.

http://www.dasionvibrator.com/