Steel straightening machine inspection regulations are there

Steel straightening machine inspection regulations are there?  1 Transmission inspection requirements: A transmission mechanism should operate smoothly, there should be abnormal sound, transmission gear and spline shaft should not have broken teeth, bite teeth, cracks and surface off; 2 Number of drive belts should be complete and should not be damaged, broken, tightness should be appropriate.  2 straightening systems and steel cutter machine supplier traction and blanking agency inspection requirements: 1 tune straight, not bent shaft, cracks and axle pin wear; 2 clutch should be sensitive and reliable combination should be consistent and should not be undercut; speed sliding gear slide should be flexible and should not traverse; 3 automatic blanking opening and closing mechanism should be flexible, blanking should be accurate, blanking frame connecting the components should be solid; 4 traction wheels should work effectively, the adjustment mechanism should be sensitive slider should not have jamming; 5 adjusting nut, return spring and sprocket mechanism should be sensitive and reliable.  3 frame, motor, bearing and tone Industrial Concrete Vibrator Rubber Hose straight-peer connection should be firm, each axis, the pin should be complete and intact. Steel straightening machine safety operation 1. Rack, material should be installed straight alignment guide tube, adjusting the centerline and the lower knife straight holes. 2. Turn the flywheel by hand, check the conveyor and the working device, tune lack of space, confirm the normal start air operation, check the bearing should be no abnormal sound, gear well before the next job is to be operating normally. 3. By adjusting the diameter of straight bars, choose the appropriate straightening blocks and transmission speed. By highly qualified before feeding. 4. In straightening block is not fixed, the front shield cover shall not feed. Jobs in various parts of the protective cover must not be opened and adjust the gap. 5. When the steel is fed, hand and wheel must maintain a certain distance, can not close. 6. Before feeding the material Electric Concrete Vibrator for sale should not head straight cut, guide tube should be installed before a 1M-long steel pipe, steel pipe must be selected and then into straight through the front of the guide hole. 7. After the job, should loosen tune straight straightening block and back to the original location, while the preload spring must return.