After the concrete mixer which work Notes

After the concrete mixer which work Notes Oper- user concrete mixer used or are aware of some considerations about the concrete mixer after work, according to the notes needed to make the operation more handy in a concrete mixer. Below we will share concrete mixer to concrete vibrator for sale china professionals working with you after what precautions? 1, concrete mixer and stones into the water after the suspension was stirred cylinder 10 to 15 minutes cleaning, then water and out. The operator shall enter such as stirring barrel cleaning. In addition to cutting off the power and remove the fuse outside, and shall lock switch box. 2. Check the mechanical components (such as motors, wire rope, bearings, brakes, clutch, etc.), if not a normal phenomenon, should immediately be repaired or replaced. 3, concrete mixer after the work is completed, it should drop down to pit in the hopper, for raising the application chain anchored, ensure hopper does not fall down. 4, is strictly prohibited methods with a large hammer to clear accumulated in the concrete mixer concrete barrel, it can only be removed with a chisel. 5, concrete mixer after stopping switches switch boxes should be locked, and cover a good motor. 6, concrete mixer in the cold season, after the work portable concrete vibrator for sale is completed and the application of water to wash the mixer drum pumps, water tanks, water put the net inside the water pipe, in order to avoid freezing. 7, blenders maintenance project maintenance procedures, maintenance operations, such as cleaning, lubricating, refueling, etc. regulations. Concrete mixer diesel High thermal efficiency of diesel mixer, low fuel consumption: the use of diesel mechanical mixing station thermal efficiency of 30% to 46%, higher than the high pressure steam turbine, gas turbine, and therefore its low fuel consumption.       Secondly mixing station equipment, compact, lightweight unit power quality: the steam turbine. A diesel generator equipment is relatively simple, less auxiliary equipment, small size, light weight, so the diesel generator metal scene is low, the unit effective kilowatt quality: low speed diesel engine 34-68kx / kw, towel-speed diesel engines of 20 a 48kx / kw, a high-speed diesel engine ll 14kx / kw, and steam power plant c ratio of 4 or more large diesel engines this indicator.       Moreover diesel rapid start mixing station circular saw machine steel bar cutting machine for sale equipment, and can quickly reach full power: diesel engine steam-driven; only a few seconds in an emergency state can ZE with a full load within lmm. In normal operation within 15-30min to full load, and steam power plant with a full load from the start to a general need 3 cents. Engine shutdown process is also very short, you can start and stop frequently.       Cooling water consumption as well as diesel mixer Dan Small. Little need plenty of water: the diesel engine unit dry watt cooling water frog is 46-ll 2L / (kW.k) and condensing steam turbine for the 48D-610L / (kW / h), a difference of nearly 10 times.       Multi-grade diesel mixer unit capacity: diesel generator unit capacity from tens of watts to tens of thousands of kilowatts dry, currently the largest single domestic unit capacity of several thousand dry tile. Used for high-rise buildings b major bridge construction, tunnel construction, industrial and mining enterprises, power plants and military installations emergency portable steel bar cutting machine standby power plant unit capacity. Selectable range, can use more than ten kinds of electrical load capacity.       Further concrete mixing station mechanical maintenance operation is simple, less required the operator. Maintenance easy.