Vibration motor in the course of caveats summary

Vibration motor in the course of caveats summary Vibration motor cable outlet for the wearing parts, often due to vibration friction damage, resulting in motor phase operation, damage to the motor. Users should regularly check the cable condition, hzs50 professional architectural concrete batch plant if worn should be replaced with type cable. Transformer on some book called stationary motor. From the definition found in the motor, so to say has its reason. Processing solutions for common problems First, boot, motor does not start, you should check: 1, the power is phase; 2, the motor is off phase; 3, guard for damage and friction eccentric; after the second boot, large motor noise, heat, etc., should be checked: 1, vibration, mechanical and electrical foot contact surface roughness meets the installation requirements; 2, whether on foot tied tight spiral; 3, the host acceleration meets the requirements; Third, the adjustment eccentric, abnormal amplitude variations, you should check: both ends of the eccentric shaft is symmetrical adjustment; Fourth, the two vibration motor vibration widely used concrete batch plants price concrete machine equipment working simultaneously, when it does not meet the requirements of the phase inversion, we must adjust its single phase sequence, do not adjust the total power of the two vibration motor phase sequence. HB-- concrete pump pinyin abbreviation T-- towed concrete pump S-- dispensing valve is S-shaped swing pipe valve (D representation of the butterfly valve, Z represents a valve) 60-- maximum theoretical throughput, m3 / The maximum pressure h13-- concrete pump at the outlet, MPa90-- motor power, kW according to the label outlet pressure levels, divided into low-pressure pump (≤5MPa), the pump (6-10MPs) and high-pressure pump (> 10MPa ); according to the maximum throughput per hour, there are 20-100m3 range, and most of the concrete pump can achieve two tranches of variable displacement or stepless variable. Users should be based on the actual needs of the project, according to the height of transmission distance and choose the outlet pressure; according to the ability to feed stirring, the choice of the output side volume; according to pumping concrete aggregate situation, choose the form of the dispensing valve. Butterfly valve on aggregate adaptability best, but reversing the cross-sectional area larger swing, suitable for low, medium grade concrete pump for infrastructure; valve pressure during pumping S-shaped swing pipe less loss, china brand hzs25 manual concrete batch plant spare parts smooth concrete flow channel, but by limiting the diameter of aggregate demand is higher, suitable for medium and high-pressure pump, suitable for high-rise buildings and concrete quality of long-distance, high-lift transport; gate dielectric performance between the butterfly and S valve on the pump more often.