Fabric machine Caution

Fabric machine Caution Fabric machine construction operations the operator must first read fabric machine manual, and learn more about the composition and safety factors related manual cloth machine. Strictly follow the relevant safety regulations before using the cloth machine can not arbitrarily lengthen and raise .3 fabric machine work, should do the inspection, check the bolts are tightened, the counterweight and boom box is balanced, fabric machine welding and other welding site with or without open phenomenon. 4 The operator shall establish the safety awareness during the operation if it is found abnormal equipment failure, should immediately stop inspection, concrete poker vibrator china brand troubleshooting before continuing to be working. 5 cloth machine operation by someone unified command, before walking on the track should be noted that, if there is abnormal or fault within the operating range, should immediately stop inspection, troubleshooting before continuing to work with. 6 fabric machine bottom plate must be based on solid and reliable, while the fabric is in a non-work state, you should install wind skid devices shall not be removed before running. 7 cloth should be checked before starting the machine all protective devices, such as wind cable rope, safety lever, fabric machine bearing is normal, and is sensitive and reliable. 8 cloth machine, cloth dryer operation should be observed in good condition, check all parts of the bearing rotation is normal, the sound is normal, once the rotation is not working should stop and check the repair job. 9 cloth machine inspection during operation to tour various parts of the operation, the focus hear the engine off signal, to prevent misuse. horizontal twin shaft concrete mixer js1000 10 fabric machine machines should be unloaded rotation, the first 3-5 laps idling, several sets of cloth series machine is running, it should begin the discharge end, a sequence start, normal operation only after all the feed ban feed after the first rotation, stop before We must stop feeding, and other concrete pump tube unload the exhausted deposit before shutdown. 11 fabric machine pouring job is completed the application of water or special cleaning cloth ball machine will clean the pipeline. 13: For long-term placement fabric machine need to be on the machine frame and cloth fabric machine stands to be demolished. 14: Textile machine stand up short-term non-removable counterweight box. Caution cloth fabric machine machine construction operations the operator must first read fabric machine manual, and learn more about the composition and safety factors related manual cloth machine. 2 strictly follow the relevant safety regulations before using the machine can not be arbitrarily extended the fabric and raise .3 fabric machine work, should do the inspection, check the bolts are tightened, the counterweight and boom box is balanced, fabric welding machine welding site with or without open and so on. 4 The operator shall establish the safety awareness during the operation if it is found abnormal equipment failure, should immediately stop inspection, Electric Concrete Vibrator for Sale price troubleshooting before continuing to be working. 5 cloth machine operation by someone unified command, before walking on the track should be noted that, if there is abnormal or fault within the operating range, should immediately stop inspection, troubleshooting before continuing to work with. 6 fabric machine bottom plate must be based on solid and reliable, while the fabric is in a non-work state, you should install wind skid devices shall not be removed before running. 7 cloth should be checked before starting the machine all protective devices, such as wind cable rope, safety lever, fabric machine bearing is normal, and is sensitive and reliable. 8 cloth machine, cloth dryer operation should be observed in good condition, check all parts of the bearing rotation is normal, the sound is normal, once the rotation is not working should stop and check the repair job. 9 cloth machine inspection during operation to tour various parts of the operation, the focus hear the engine off signal, to prevent misuse. 10 fabric machine machines should be unloaded rotation, the first 3-5 laps idling, several sets of cloth series machine is running, it should begin the discharge end, a sequence start, normal operation only after all the feed ban feed after the first rotation, stop before We must stop feeding, and other concrete pump tube unload the exhausted deposit before shutdown. 11 fabric machine pouring job is completed the application of water or special cleaning cloth ball machine will clean the pipeline. 13: For long-term placement fabric machine need to be on the machine frame and cloth fabric machine stands to be demolished. 14: Textile machine stand up short-term non-removable counterweight box. Caution 1 cloth machine fabric machine construction operations the operator must first read the fabric machine manual, and learn more about the composition and safety factors related manual cloth machine. 2 strictly follow the relevant safety regulations before using the machine can not be arbitrarily extended the fabric and raise .3 fabric machine work, should do the inspection, check the bolts are tightened, the counterweight and boom box is balanced, fabric welding machine welding site with or without open and so on. 4 The operator shall establish the safety awareness during the operation if it is found abnormal equipment failure, should immediately stop inspection, troubleshooting before continuing to be working. 5 cloth machine operation by someone unified command, before walking on the track should be noted that, if there is abnormal or fault within the operating range, should immediately stop inspection, troubleshooting before continuing to work with. 6 fabric machine bottom plate must be based on solid and reliable, while the steel bar thread cutting machine fabric is in a non-work state, you should install wind skid devices shall not be removed before running. 7 cloth should be checked before starting the machine all protective devices, such as wind cable rope, safety lever, fabric machine bearing is normal, and is sensitive and reliable. 8 cloth machine, cloth dryer operation should be observed in good condition, check all parts of the bearing rotation is normal, the sound is normal, once the rotation is not working should stop and check the repair job. 9 cloth machine inspection during operation to tour various parts of the operation, the focus hear the engine off signal, to prevent misuse. 10 fabric machine machines should be unloaded rotation, the first 3-5 laps idling, several sets of cloth series machine is running, it should begin the discharge end, a sequence start, normal operation only after all the feed ban feed after the first rotation, stop before We must stop feeding, and other concrete pump tube unload the exhausted deposit before shutdown. 11 fabric machine pouring job is completed the application of water or special cleaning cloth ball machine will clean the pipeline. 13: For long-term placement fabric machine need to be on the machine frame and cloth fabric machine stands to be demolished. 14: Textile machine stand up short-term non-removable counterweight box.