Concrete pump operation

Concrete pump operation

(1) sand particle size, grade and Mix cement factory specification shall be required to meet the mechanical performance requirements of the pump. Parking brake and locking brake (2) pumping equipment shall be used simultaneously, tires should wedge, water supply and water tanks should be properly stocked with water, should be no debris in the hopper, the lubrication points should be lubricated properly. Ministries bolt (3) pumping equipment should be tightened, sealing pipe joints should be tightened, guards should be complete and reliable. (4) operated at the beginning of each part, adjust the handles, hot sale joonna brand cs50 electric concrete vibrator hand wheels, levers, cocks, etc. should be in the correct position. Hydraulic system should normally be no leakage. (5) Prepare a good cleaning pipes, cleaning supplies and other related devices. Before the job, you must use the required preparation of cement mortar lubrication line. Non-essential personnel to leave the pipeline. (6) leg should be fully extended and supported the prison, not fixed may not start before the boom. After the boom elevated stand before rotation. When the order boom should extend. Do not use boom lift or drag objects. (7) When the boom is in the fully extended state, non-moving body. When a job needs to be moved, it should be fixed on the segment boom collapsed, moving no faster than 10km / h. Boom may not use more than a predetermined diameter pipe, tube should be attached to the wheel off prevention safety rope system. (8) should be ready to monitor a variety of instruments and indicators, we found not normal, timely adjustment or treatment. In case of duct blockage, the reverse operation of the concrete should return the hopper, when necessary, to exclude demolition tube blockage. (9) under pressure pumping system can not open any pipelines and hydraulic pipes. Valve hydraulic system must not be adjusted. Accumulator filled only ammonia. (10) job, it must be concrete and pipes inside the hopper full output, and then pumps, hoppers, pipe cleaning. When using compressed air flushing pipes, pipe within 10m exit end can not stand in front of people, and applications and other metal basket to collect out of foam rubber and sand grains. (11) Do not use compressed air to flush boom pipe. Fold contraction shall be the order boom. (12) each part of the operation switch, adjust the handles, hand wheels, control sweat, cocks, etc. should be reset. Hydraulic system unloading.

Tips

(1) operators and related equipment management personnel chinese type new mechanical concrete vibrator with ce should read the instruction manual and grasp the structural principle, use and maintenance of the knowledge and pumping concrete; the use and operation of concrete pump, should be strictly in accordance with the instructions executed. Because the operator can fully grasp the mechanical properties of the need to have a process, it should be randomly alternate instruction manual. At the same time, should develop specific action points based on manual, to achieve effective control of pumping technology in some variables, such as the pump position, piping, etc. (2) supporting concrete pumps ground should be flat, solid; machine required horizontal, not inclined during operation. Legs should be stably support machine, and securely locked or fixed. Position both easy to pump concrete mixer truck in and out of the hopper and feed, but also beneficial to consider pumping and piping to reduce the pumping pressure loss, and to ask from the pouring location near convenient power and water supply. (3) should be carried out according to the construction site characteristics pipes and concrete placement scheme, piping design to the level of checking whether the pipeline in terms of distance from the concrete pumps and pumping adapt. Piping should be as short as possible length of the pipeline, less elbow and hose. Delivery pipe laying pipelines should be easy to clean, troubleshooting, and disassembly and maintenance. When the new pipes and old pipe mix, should the new pipe installation in pumping pressure at large. Piping process should draw piping diagrams, lists a variety of pipe fittings, pipe card, elbow and hose size and number, and provide a list. (4) the need to perpendicular to the pipe, as the height increases an increase of potential energy, there is upward trend reflux concrete, and therefore should be laid horizontal pipe length between the concrete pump and vertical piping, in order to ensure there is enough concrete to prevent resistance reflux. When pumping concrete high-rise buildings require vertical pipe up, at which time the ground level pipe length less than 1/4 the 2013 hot sale js500 twin shaft concrete mixer for sale length of the vertical tube. When as a result of space limitations, can not be placed above the desired length of water pipe, can be bent pipe or hose instead.