Concrete mixer Practice

Concrete mixer Practice 1, stationary concrete mixer console should enable the operator to see the work of the various parts, instrument instruction signal is accurate and reliable electric concrete mixer console should be a straight rubber mat or dry wood boards.        2, check the concrete mixer drive Bridge concrete mixer for sale china mechanism, working device, whether it is securing reliable brakes, to ensure the normal operation, the ring gear, pulleys, etc. should be provided protective cover. 3, the choice of aggregate size should be consistent with the concrete mixer performance, beyond the scope of the license can not be used.        4, ring gear concrete mixers, such as rotating slide wear parts should always add oil.  5, the first for empty running, check the concrete mixer drum rotation direction of mixing or stirring the leaves of operation of the brake of the working device, after confirming the function of normal, before starting work.        6, feed, non-head and hand into the hopper and rack View or Tanmo feed situation, concrete mixer operation can not be stirred by hand or tools to stretch into the barrel grip material discharge.    7, when the concrete mixer hopper lifting prohibiting work below or walk through.        8, the stirring cylinder additives for concrete mixer should be in operation, adding new material must first concrete mixer concrete all original to the post-imperial, not start concrete mixer halfway down or fully loaded, of course reversal excluded.  9, concrete mixer operations, such as failure can not continue to operate, should immediately cut off the power, and the concrete mixer mixing concrete barrel cleaned and inspected.        10, after the operation, should be fully progressive block concrete mixer china market cleaned concrete mixer operator when the cartridge cleaning To enter, you must cut off the power, and send someone outside guardianship, or remove the fuse and lock box before entering the gates. After the job should fall to the hopper pit hopper, then the application must be raised as the chain anchored.  11. Mobile concrete mixer when long-term disabled or deactivated for longer than three months, it should remove the safekeeping tire, wheel ends should be clean and rust do work, so as not to affect the operation.        12, carried out after the winter concrete mixer operation, should be promptly pumps, drain switch, the amount of water to make the water in the place, in order to avoid the emergence of low temperature freezing phenomenon. First concrete mixer function on the column switch appropriated for the automatic position, press the start switch on the controller, the entire program will run automatically self-control operation. high performance js siemens siemens concrete cement mixer machine After running the entire process is completed automatically stop, and if half-way down the run the project, you can press the button again to restart. After pressing the start button, the display starts to display the time, slow, sand, fast, stop, fast, on time running lights flashing. Automatic control, manual function switch must be appropriated all stop position.