Concrete mixer mixing quality of important factors

Concrete mixer mixing quality of important factors: As usual for the production of concrete mixer concrete workshop or a little mixing station. Concrete mixers played a significant role in engineering construction. It is also close to a lot of other construction. Concrete mixer so essential precondition necessary adapt all kinds of site topography request based on the difference between rigid plan and its components, 2015 hot js750 concrete mixing equipment cement mixer and one in particular, it is first and foremost one is: mechanical skills for efficacy modify, add and expand, automation systems need to have a high degree of flexibility. Concrete mixer mixing quality primary factors: Construction situation mixer, blender feed capacity and how much volume ratio mixing drum, mixed French and feeding material feeding position, set up equipment, furnishings and stirred disaggregated how much the angle of the blade, stirring speed and blade liner wear status. Operating self-loading concrete mixers precautions: Self-loading concrete mixers mix barrel wall radially arranged stirring blades. After the operation, the mixing drum rotation about its horizontal axis, adding mix barrel material, the blade is lifted to a certain height, by weight fall, this cycle of movement, to achieve uniform mixing effect. Fall-from simple structural concrete mixer, generally stirred plastic concrete based. The following technical staff for you always said operating self-loading concrete mixers precautions: (1) Before the new machine should cement mixers sale jzm350 concrete mixer -top selling be in accordance with the requirements of the concrete mixer instructions for use of the systems and components necessary itemized inspection and commissioning. Empty running, check the direction of rotation of the mixing tube or stirring the leaves, the operation of the working device, brake, confirmed normal before operation. (2) stationary concrete mixer, should be installed on a solid pedestal. When long-term use, should anchor bolts embedded; if short-term use, laying sleepers and looking at flat stable base. (3) The mobile concrete mixer, should be installed on a flat hard wood or aerodromes with square brackets stand firm and keep the tire from the horizontal force. If you use more than three months or more, remove the tire should keep the axle ends should be prepared to clean the rust prevention work. (4) provided for some of the need to dig a pit on the hopper agitator, which should elevate the compacted around the pit to prevent surface water flowing into the pit. Feeding the bottom bearing surface track frame should consolidate or tiling, back frame shall be supported with wood, to prevent deformation of the track work. (5) concrete mixer started after the mixing tube should be made to achieve normal rotational speed of the material, the material should be promptly after adding water; add a new material, you must first post hot sell electruc concrete mixer –js1500 from china within the original concrete mixer can be discharged completely. Or when you can not be half-way down mixer full load start, reverse the material otherwise. (6) The use in the concrete mixer, do not allow sand to fall into the operation of the machine part, so as not to damage the moving parts jammed. After lifting the hopper, can not fight under someone through or staying, so as not to brake failure accidents. Such as will repair or cleanup work at the bucket, forced down the hopper with the safety chain and pull firmly.