Concrete mixers for general highway, power plants, dam engineering, construction sites, roads, bridges, utilities, and medium-sized precast plant and other projects. Has a smooth, low energy consumption, compact structure, reliable transmission, it is important light production efficiency advantages, can mix plasticity, dry hard, mobility and lightweight aggregate concrete and mortar.     Department of twin-shaft compulsory concrete mixer china concrete mixer plant concrete mixer JS series, the feeding system by the hoist, the feeder, hopper and other equipment. Concrete mixer supporting drum brake motors rotate through reducer drive, tow rope through the pulley frame rail hopper frame upward climb mixing equipment mixing equipment anchor stirring device small mixing device small mixing low-speed stirrer speed stirring device, when the climb to After a certain height, a pair of rollers hopper door into the upper rack level fork, then automatically open Doumen, the material through the hopper into the stirred tank, and then stirred. To ensure accurate hopper concrete mixer place in the material rack with limit switches, the upper limit position limit switches have two, respectively hopper plays a limit and safety protection. Concrete mixer is only one limit to the lower limit switch, mounted on the top of the track, when the hopper down to the pit emulsion pump laboratory emulsifying machine emulsifying machine emulsifying machine dispersing machine high shear emulsifying machine emulsifying machine pipeline colloid mill at the bottom of the solid-liquid emulsion machine when the rope a little loose, spring bar mechanism starts lower limit switch, hoist will automatically stop. So that the entire feeding mechanism and workflow ends.

Note the use of concrete mixer When concrete mixer work should pay attention:

Concrete mixers often such problems occur during use, so in terms of inspection before the work is particularly important to be careful.     1, if the concrete mixer is new, so before use, hls90 ready concrete mixing plant as required concrete mixer instructions for use of the systems and components necessary itemized inspection and commissioning. Empty running, check the direction of rotation of the mixing tube or stirring the leaves, the operation of the working device, braking, confirm normal only job.     2, if the concrete mixer is fixed, and should be installed on a solid pedestal. When long-term use, should anchor bolts embedded; if short-term use, laying sleepers in the flat base and find stable.     3, if a mobile concrete mixer should be installed on a flat hard wood or aerodromes with square brackets stand firm and keep the tire from the horizontal force. If you use more than three months or more, remove the tire should keep the axle ends should be prepared to clean rust prevention work. 4, if the concrete mixer set on the hopper need to dig a pit, which should elevate the compacted around the pit to prevent surface water flowing into the pit. Feeding the bottom bearing surface of the track frame should consolidate or tiled box mixing equipment mixing equipment anchor stirring device small mixing device small mixing low-speed stirrer speed stirring device, back of the rack should also be supported with timber to prevent work When the track deformation. Concrete mixer work should pay attention:     1, after the concrete mixer started after the 2014 hongying jzc300 mobile concrete mixer plant mixing tube should be carried out up to speed on the material, the material in a timely manner after adding water. After adding new material must first of all within the existing concrete mixer discharge can take place. Or when you can not be half-way down mixer full load start, reverse the material otherwise.     2, concrete mixer Never use gravel to fall during operation of the machine part to go, so as not to damage the moving parts jammed. After the bucket elevator, bucket through or staying at someone can not avoid brake failure accidents. Such as will repair or clean up at the bucket, forced down the hopper with the safety chain and braced.     3, concrete mixer at work can not continue to operate if found fault, should immediately cut off the power, the stirring barrel concrete cleaned and inspected. After the concrete mixer work should pay attention:     1, concrete mixer mixer after the completion of a comprehensive job to deal with the cleaning, the operator if necessary into the barrel clean, must be cut off, let someone outside the guardianship, or shed and locked gates fuse box, then before entering.     2, concrete mixers hopper crank handle, the application of a pin fixed to avoid people into simple clean up, touch the body to make hopper elevators shake, squeeze the accident occurred.