Shape

Shape

The car itself is a whole, sub-mixers, pressure, intelligent controller and motor vehicle body.

Special performance

1, the use of special wear-resistant steel plate Wuhan Iron and Steel mixing tube and leaves. 2, the production of the mixing tube blades made of special mold stamping. 3, the tank and the blade shengjie hzs 180 concrete batching plant design butt welding using large rotary tooling, high precision. 4, the hydraulic system used in all imported components, compact, high performance. 5, vehicle modeling chic, beautiful, compact structure. 6, the operating system is flexible and convenient to realize around and feed port operating three to one. 7, after welding tank pretreatment process using shot peening to achieve rust, rust.

Instructions

1. Before the concrete mixer operation must be checked to confirm steering, braking, lighting, sensitive and effective signaling system, mixer truck drum and chute free of cracks and serious injury, stirring blade wear in the normal range, chassis and sub-frame U-bolt connection between good. 2, to understand construction requirements and site conditions. Choose Driving Directions and parking locations. 3, in the community roads must comply with traffic rules. Turning radius requirements shall comply with instructions for use, speed of no more than 15km. Stop speed of not more than 5km. 4, when the job is forbidden to touch the rotating drum and wheels. 5, in the concrete mixer reversing discharge, must obey the command, pay attention to those around them, abnormal immediately stop. 6, concrete mixer cleaning operation is prohibited under high-voltage lines.

Concrete mixer truck from the vehicle chassis and concrete mixing transport special device. China's production of concrete mixer truck chassis to use more vehicle manufacturers to provide two types of common chassis. Its special mechanism includes power take off, before mixing tube frame, gearbox, hydraulic systems, the mixing tube, steering mechanism, the cleaning system. Works by taking the power plant will power the vehicle chassis removed and driven variable displacement pump hydraulic system, the mechanical energy into hydraulic energy to pass quantitative motor, the motor and then drive gear by gear driven stirring means for concrete stirring.

1, the hydraulic system pressure should comply with the instructions for use, and shall not be adjusted. Hydraulic oil and fuel oil should comply with the original requirements. 2, before loading mixer, mix should be drained of water and debris remaining barrel. jh mini concrete pump truck for saleDuring transport to keep the rotation to prevent concrete segregation. Mixer before access to the site and unloading, should make full mixing drum to 14-18 rev / min rotation for 1-2 minutes, then invert discharge. Before reversing, should be parked mixing tube does not rotate. 3, the ambient temperature is above +25 degrees Celsius, from the loading, transport, the discharge duration shall not exceed 60 minutes, the ambient temperature is below +25 degrees Celsius, the above time shall not exceed 90 minutes. 4, winter construction, should be fully implemented: start before checking whether the ice; work when the barrel and mix carefully exclude residual water supply system, turn off the pump switch, the lever is placed in the "stop" position. 5, after the completion of the construction site discharge, immediately rinse with a hose mixer comes into the hopper, the hopper, discharge chute, etc., remove adhered to throughout the body sludge and concrete. On the way back mixing station, should be stirred cylinder injection 150 --- 200L water to clean the cylinder wall and the blade bonded concrete residue. 6, every day after work, drivers should be accountable to the cylinder into the water and stirring speed (14-18 rev / min) rotation for 5-10 minutes, then drain the water, in order to ensure the barrel clean. When using high-pressure water cleaning various parts of saidy truck mounted boom concrete pump the mixing tube, it should pay attention to avoid instrumentation and joysticks and other parts. Distance pressure water nozzle and body paint surfaces shall not be less than 40 cm. 7, cleared the contamination inside and outside the mixing tube and concrete clinker remaining, as well as into the barrel when the machine repair personnel for maintenance and welding work, you must first turn off your vehicle engine, so that the mixing tube to a complete stop. In machine repair personnel work into the barrel during the barrel must ensure mixing ventilation, fresh air, no natural gas and hazardous dust, adequate oxygen supply (do not use oxygen). When using a power tool cylinder operation, the operator must have good insulation.